Delivering quality is always our priority, which is why our products and processes meet standards and hold certifications. We design according to all standardized building codes.
Quality control
We have a production-independent quality control department. Prior to production, we determine what tests and inspections are needed according to the construction standard and to meet your requirements. Our quality control department performs inspections and partial tests during production. At the final acceptance of a tank, you are invited to be present at the final checks performed by our quality control staff. We are provided with all the equipment for performing various quality tests:
- Riboflavin test
- X-ray
- Penetrant test
- Visual welding inspection
- Drain test
- Pressure test/full-of water test
- Roughness measurement
- Vacuum box test
- Thickness measurement
Certifications & Standards
To ensure our quality, our products and services comply with relevant certifications and standards:
- ISO 9001:2015
- ISO 14001:2015
- ISO 45001:2018
- ASME U
- PED Module H & H1
- UKCA – PER Module H & H1
- DIN EN ISO 3834-2
- EN 1090-2 EX3
- KIWA BRL-K756-03
- KIWA BRL-K21051-01
PED module H + H1 – We are audited and accredited by Lloyd’s Register for the independent design and construction of pressure tanks from 0.5 bar. For these PED pressure vessels we can therefore issue our own CE declaration, which means a faster delivery time for you.
EHEDG – Our engineers are familiar with the EHEDG guidelines.
ATEX – A certificate may be important to you for an explosion proof installation. We are happy to advise you on this for a safe and approved ATEX installation.
Building Codes
- EN13445
- EN14015
- KIWA BRL-K756-03
- KIWA BRL-K21051-01
- PGS 29
- PGS 30
- AD merkblätter
- RTOD
- Britisch Standard 2654
- ASME
- VLAREM
Installation
Besides engineering and production we also take care of the installation of your tank and accessories. Gpi is VCA** certified for the installation of stainless steel (pressure containing) tanks, fittings and installations. Our qualified installation department works according to strict procedures and instructions that are regularly checked by Lloyd's Register.
Questions?Audits
We are happy to cooperate if you wish to have additional tests and checks performed by a third party yourself. You are welcome to have an audit at our locations so that you can experience our quality for yourself. In addition, we support you in conducting ongoing periodic tests throughout the life of your installations.
Permits and Regulations
It is important for you to make a good inventory beforehand of the requirements your installation and tank must meet. When issuing permits, the government may refer to various norms and standards, such as PGS 29, 30 & 31 and EN 14015 and EN 13445. Our experts are familiar with these regulations and can provide you with professional advice for obtaining your permit. In addition, we can support you during discussions with government agencies if necessary.
More about us
About Gpi Tanks
Tank builder and tank partner. Gpi Tanks is a professional tank builder with more than 25 years of experience and our mission is to add value to your processes.
Read moreGpi Tanks & Process Equipment
Are you looking for process equipment, extra large stainless steel tanks or complex pharmaceutical tanks? Gpi Tanks is part of the Gpi Group. Read more about our companies and capabilities.
Read moreWe are happy to help you!
Wish to know more? Send us a message or call and we will help you as soon as possible!